2000L beer brewing equipment, can provide engineers overseas services, each customer 5 years warranty.
In a spring with a green hope, in the northernmost tip of the northern Dutch peninsula, Mr. Gerard ‘t Hooft’s hometown of Den Helder, born one new life–a living craft microbrewery was built here, The coming of this craft brewery bring apparent fresh and living.
Stadsbrouwerij Helderse Jongens was founded by two young boys, dedicated to producing the finest quality beers.
We made contacted from September,2016, after about 3 months detailed discussion, our company was chosen to be the final supplier of their brewing equipment, it was exciting ,honor ,and full of challenge as their was limited time for us to complete the production for them.
To help customer realize their brewing dream, we always do our best, forever……….
Finally we got agreement on every detail in Winter of 2016 and we contracted quickly on copy files sent via emails.
Yes, we finished most of the talking via emails, Skype or WhatsApp.Here I have to say that we should thank for the modern communication ways that make all communication freely and really efficiently.
Then our team started to work out the detailed manufacturing plan, make mechanical drawing for every tank, purchase the material and accessories etc.
When all the paper work was ready and the material was tested to be good, here came the important fabrication processed by our professional team.
The fabrication included measuring, stainless steel plate cutting, welding, polishing, jacket fabricating, pressure & leakage testing, piping and system assembly etc.
We had specified technician to strictly control and monitor the whole process.
The brewery building has been ready before our tanks arrived. Two of our workers are sent to help install this 1000liter brewery system. Place all tanks in their right position as in the floor plan; Adjust the foot pads to make sure all tanks horizontal and vertical; Then glycol piping and brewhouse piping were connected; Connect the electric cables; Build the steam supply lines; finally this craft brewery plant was ready for commissioning.
If everything works well for two days, we can do the insulation work for brewery glycol cooling system. Everything was done.
The next step was to waiting for prepare several type of pet craft beer for the Opening Day.